{"id":7715,"date":"2025-03-20T13:42:26","date_gmt":"2025-03-20T11:42:26","guid":{"rendered":"https:\/\/apavil.ro\/?p=7715"},"modified":"2025-03-20T13:43:39","modified_gmt":"2025-03-20T11:43:39","slug":"proiect-nemajor-pentru-realizarea-ratei-de-conectare-de-100-in-ramnicu-valcea-ocnele-mari-dragasani-calimanesti-babeni-si-baile-olanesti","status":"publish","type":"post","link":"https:\/\/apavil.ro\/?p=7715","title":{"rendered":"PROIECT NEMAJOR PENTRU REALIZAREA RATEI DE CONECTARE DE 100% \u00ceN R\u00c2MNICU V\u00c2LCEA, OCNELE MARI, DR\u0102G\u0102\u0218ANI, C\u0102LIM\u0102NE\u0218TI, B\u0102BENI \u0218I B\u0102ILE OL\u0102NE\u0218TI"},"content":{"rendered":"\n<p class=\"has-text-align-center\" style=\"font-size:36px; line-height:48px;\"><strong>PROIECT NEMAJOR PENTRU REALIZAREA RATEI DE CONECTARE DE 100% \u00ceN R\u00c2MNICU V\u00c2LCEA, OCNELE MARI, DR\u0102G\u0102\u0218ANI, C\u0102LIM\u0102NE\u0218TI, B\u0102BENI \u0218I B\u0102ILE OL\u0102NE\u0218TI<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\">Cod SMIS 2014+ 161869 &#8211; etapa I<\/p>\n\n\n\n<p class=\"has-text-align-center\">Cod SMIS 2021+ 318852 &#8211; etapa II<\/p>\n\n\n\n<p class=\"has-text-align-center\">Proiect cofinan\u021bat din Fondul de Coeziune prin POIM 2014-2020 (etapa I) \u0219i din Fondul European de Dezvoltare Regional\u0103 prin PDD 2021-2027 (etapa II)<\/p>\n\n\n\n<style>\n.wp-block-post-template{\nlist-style:none!important\n}\n#content .post {\npadding-bottom:0px;\n}\n.wp-block-separator{\nmargin: 1px 0;\n}\n<\/style>\n<table style=\"border:none;\"><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\" style=\"border:0;width:400px;\"><img style=\"height: 100;\" src=\"https:\/\/apavil.ro\/materiale\/pdd\/pdd.png\"><\/td><td class=\"has-text-align-right\" data-align=\"right\" style=\"border:0; width:400px;\"><img style=\"height: 100px;\" src=\"https:\/\/apavil.ro\/materiale\/images\/sigla_guv_coroana_albastru.png\"><\/td><\/tr><\/tbody><\/table>\n\n\n\n<p>Valoarea total\u0103 a contractului de finan\u021bare pentru etapa I este de 42.539.400,96 lei, din care valoarea eligibil\u0103 este de 32.722.696,88 lei (finan\u021bare nerambursabil\u0103, contribu\u021bia financiar\u0103 de la bugetul de stat \u0219i bugetele locale), contribu\u021bia Uniunii Europene fiind de 26.145.434,81 lei din Fondul de Coeziune.<\/p>\n\n\n\n<p>Valoarea total\u0103 a contractului de finan\u021bare pentru etapa II este de 25.912.413,31 lei, din care valoarea eligibil\u0103 este de 21.743.166,24 lei (finan\u021bare nerambursabil\u0103, contribu\u021bia financiar\u0103 de la bugetul de stat \u0219i bugetele locale), contribu\u021bia Uniunii Europene fiind de 17.372.789,83 lei din Fondul European de Dezvoltare Regional\u0103.<\/p>\n\n\n\n<p>Prin prezentul proiect se urm\u0103re\u0219te finan\u021barea lucr\u0103rilor de investi\u021bii care vor avea urm\u0103toarele <strong>rezultate\/beneficii:<\/strong><\/p>\n\n\n\n<p><strong>AP\u0102<\/strong><strong>:<\/strong><\/p>\n\n\n\n<p>&#8211; cre\u0219terea gradului de acoperire cu servicii de apa \u00een zona urban\u0103 la 100%;<\/p>\n\n\n\n<p>&#8211; \u00eembun\u0103t\u0103\u021birea infrastructurii re\u021belelor de ap\u0103 potabil\u0103;<\/p>\n\n\n\n<p>&#8211; asigurarea accesului la ap\u0103 potabil\u0103 de calitate a popula\u021biei din zona rural\u0103;<\/p>\n\n\n\n<p>&#8211; servicii de calitate \u0219i conforme cu reglement\u0103rile europene \u00een vigoare prin asigurarea siguran\u021bei \u00een exploatare \u0219i continuitatea furniz\u0103rii serviciului de alimentare cu ap\u0103;<\/p>\n\n\n\n<p>&#8211; cre\u0219terea gradului de conectare la serviciile de alimentare cu ap\u0103 \u00een zona rural\u0103;<\/p>\n\n\n\n<p>&#8211; reducerea pierderilor de ap\u0103 din re\u021belele de distribu\u021bie;<\/p>\n\n\n\n<p>&#8211; reducerea consumului de energie electric\u0103;<\/p>\n\n\n\n<p>&#8211; asigurarea accesului la servicii de alimentare cu ap\u0103 de calitate pe baza principiului maximiz\u0103rii eficien\u021bei costurilor \u0219i calit\u0103\u021bii \u00een operare;<\/p>\n\n\n\n<p><strong>AP\u0102 UZAT\u0102:<\/strong><\/p>\n\n\n\n<p>&#8211; cre\u0219terea gradului de acoperire cu servicii de ap\u0103 uzat\u0103 la 100% \u00een aglomer\u0103rile urbane;<\/p>\n\n\n\n<p>&#8211; \u00eembun\u0103t\u0103\u021birea infrastructurii re\u021belelor de canalizare.<\/p>\n\n\n\n<p><strong>Realizarea acestor obiective conduce la:<\/strong><\/p>\n\n\n\n<p>&#8211; conformarea cu Directiva (UE) 2024\/3019 \u0219i Directiva 91\/271\/CEE privind epurarea apelor uzate urbane la nivelul ariei proiectului;<\/p>\n\n\n\n<p>&#8211; cre\u0219terea procentului de conectare la un sistem centralizat de colectare \u0219i epurare al apei uzate;<\/p>\n\n\n\n<p>&#8211; reducerea infiltra\u021biilor;<\/p>\n\n\n\n<p><a><\/a> &#8211; \u00eembun\u0103t\u0103\u021birea calit\u0103\u021bii emisarului prin reabilitarea re\u021belei de canalizare, astfel \u00eenc\u00e2t tot debitul colectat s\u0103 fie deversat \u015fi epurat \u00een sta\u021bia de epurare;<\/p>\n\n\n\n<p>&#8211; protejarea mediului prin devers\u0103ri controlate care s\u0103 respecte parametrii impusi la evacuare;<\/p>\n\n\n\n<p>&#8211; asigurarea unor servicii de calitate \u0219i conforme cu reglement\u0103rile europene \u00een vigoare.<\/p>\n\n\n\n<p><strong>Proiectul presupune investi\u021bii \u00een infrastructura de ap\u0103 \u0219i ap\u0103 uzat\u0103 a jude\u021bului V\u00e2lcea, prin intermediul a 7 contracte de lucr\u0103ri<\/strong><strong>:<\/strong><\/p>\n\n\n\n<ul><li><strong>CL 12<\/strong> &#8211; Realizarea ratei de conectare de 100% \u00een R\u00e2mnicu V\u00e2lcea inclusiv Ocnele Mari &#8211; Autoriza\u021bie de Construire (AC) nr.623\/21150\/18.06.2019 emis\u0103 de Prim\u0103ria R\u00e2mnicu V\u00e2lcea; AC 28\/15.06.2023 emis\u0103 de Prim\u0103ria Ocnele Mari. Contractul de lucr\u0103ri este reziliat. Progres Fizic 52.42%.<\/li><li><strong>CL 13<\/strong> &#8211; Realizarea ratei de conectare de 100% \u00een B\u0103beni &#8211; AC 16\/06.02.2019 emis\u0103 de Prim\u0103ria B\u0103beni. Contractul de lucr\u0103ri este finalizat.<\/li><li><strong>CL 14<\/strong> &#8211; Realizarea ratei de conectare de 100% \u00een Dr\u0103g\u0103\u0219ani &#8211; AC 48\/23.04.2019 emis\u0103 de Prim\u0103ria Dr\u0103g\u0103\u0219ani. Contractul de lucr\u0103ri este finalizat.<\/li><li><strong>CL 15<\/strong> &#8211; Realizarea ratei de conectare de 100% \u00een B\u0103ile Ol\u0103ne\u0219ti &#8211; AC 119\/13.11.2020 emis\u0103 de Prim\u0103ria Ol\u0103ne\u0219ti, AC 68\/05.04.2021 emis\u0103 de Prim\u0103ria P\u0103u\u0219e\u0219ti M\u0103gla\u0219i. Progres Fizic 55.22 %.<\/li><li><strong>CL 16<\/strong> &#8211; Realizarea ratei de conectare de 100% \u00een C\u0103lim\u0103ne\u0219ti &#8211; AC 116\/03.06.2019 emis\u0103 de Prim\u0103ria C\u0103lim\u0103ne\u0219ti. Contractul de lucr\u0103ri este finalizat.<\/li><li><strong>CL12 &#8211; Rest de executat<\/strong> pentru Realizarea ratei de conectare de 100% \u00een R\u00e2mnicu V\u00e2lcea inclusiv Ocnele Mari &#8211; AC 623\/21150\/18.06.2019 emis\u0103 de Prim\u0103ria R\u00e2mnicu V\u00e2lcea; AC 28\/15.06.2023 emis\u0103 de Prim\u0103ria Ocnele Mari. Contractul de lucr\u0103ri este \u00een implementare.<\/li><li><strong>CL15 &#8211; Rest de executat<\/strong> pentru Realizarea ratei de conectare de 100% \u00een B\u0103ile Ol\u0103ne\u0219ti &#8211; AC 119\/13.11.2020 emis\u0103 de Prim\u0103ria Ol\u0103ne\u0219ti, AC 68\/05.04.2021 emis\u0103 de Prim\u0103ria P\u0103u\u0219e\u0219ti M\u0103gla\u0219i. Contractul de lucr\u0103ri este \u00een implementare.<\/li><\/ul>\n\n\n\n<p><strong>Proiectul cuprinde \u0219i 4 contracte de servicii<\/strong><strong>:<\/strong><\/p>\n\n\n\n<ul><li><strong>CS04 &#8211;<\/strong> Asisten\u021ba Tehnic\u0103 pentru Supervizarea Lucr\u0103rilor Proiectului &#8220;Realizarea ratei de conectare de 100% \u00een R\u00e2mnicu V\u00e2lcea, inclusiv Ocnele Mari, Dr\u0103g\u0103\u0219ani, C\u0103lim\u0103ne\u0219ti, Ol\u0103ne\u0219ti \u0219i B\u0103beni, judetul V\u00e2lcea&#8221;. Contractul de servicii este finalizat.<\/li><\/ul>\n\n\n\n<ul><li><strong>CS05 &#8211;<\/strong> Auditul Proiectului &#8220;Realizarea ratei de conectare de 100% \u00een R\u00e2mnicu V\u00e2lcea inclusiv Ocnele Mari, Dr\u0103g\u0103\u0219ani, C\u0103lim\u0103ne\u0219ti, Ol\u0103ne\u0219ti \u0219i B\u0103beni, jude\u021bul V\u00e2lcea&#8221;,<\/li><li><strong>CS07 &#8211;<\/strong> Servicii de publicitate \u0219i informare \u00een vederea promov\u0103rii proiectului \u201cRealizarea ratei de<\/li><\/ul>\n\n\n\n<p>conectare de 100% \u00een R\u00e2mnicu V\u00e2lcea inclusiv Ocnele Mari, Dr\u0103g\u0103\u0219ani, C\u0103lim\u0103ne\u0219ti, Ol\u0103ne\u0219ti \u0219i<\/p>\n\n\n\n<p>B\u0103beni, jude\u0163ul V\u00e2lcea\u201d,<\/p>\n\n\n\n<ul><li><strong>CS08 &#8211; <\/strong>Servicii de publicitate \u0219i informare \u00een vederea promov\u0103rii proiectului &#8221; Proiect Nemajor pentru Realizarea ratei de conectare de 100% \u00een R\u00e2mnicu V\u00e2lcea, Ocnele Mari, Dr\u0103g\u0103\u0219ani, C\u0103lim\u0103ne\u0219ti, B\u0103beni \u0219i B\u0103ile Ol\u0103ne\u0219ti\u201d &#8211; Etapa I \u0219i Etapa II.<\/li><\/ul>\n\n\n\n<ul><li><strong>Lucr\u0103ri prev\u0103zute \u00een cadrul proiectului<\/strong><strong>:<\/strong><\/li><\/ul>\n\n\n\n<p><em><u><strong>Investi\u021biile \u00een alimentarea cu ap\u0103<\/strong><\/u><\/em> se propun \u00een 2 SAA (sisteme de alimentare cu ap\u0103): SAA B\u0103beni \u0219i SAA B\u0103ile Ol\u0103ne\u0219ti, iar componentele de investi\u021bii \u00een sectorul de ap\u0103 sunt:<\/p>\n\n\n\n<p><strong>ETAPA I &#8211; POIM<\/strong> <strong>ETAPA II &#8211; PDD<\/strong><\/p>\n\n\n\n<p>Re\u021bele distribu\u021bie (extindere) &#8211; 10.799 km; Re\u021bele distributie (extindere) &#8211; 0.160 km;<\/p>\n\n\n\n<p><strong><\/strong>Sta\u021bii de pompare ap\u0103 potabil\u0103 &#8211; 4 buc\u0103\u021bi.<\/p>\n\n\n\n<p><em><u><strong>Investi\u021biile \u00een colectarea \u0219i tratarea apei uzate<\/strong><\/u><\/em> se propun \u00een 5 aglomer\u0103ri &#8211; Aglomerarea B\u0103beni, Aglomerarea B\u0103ile Ol\u0103ne\u0219ti, Aglomerarea C\u0103lim\u0103ne\u0219ti, Aglomerarea Dr\u0103g\u0103\u0219ani, Aglomerarea R\u00e2mnicu V\u00e2lcea (inclusiv UAT Ocnele Mari).<\/p>\n\n\n\n<p>Componente de investi\u021bii \u00een sectorul de ap\u0103 uzat\u0103 sunt:<\/p>\n\n\n\n<p><strong>ETAPA I &#8211; POIM<\/strong> <strong>ETAPA II &#8211; PDD<\/strong><\/p>\n\n\n\n<p>Re\u021bea canalizare (extindere) &#8211; 58.092 km; Re\u021bea canalizare (extindere) -12.737 km;<\/p>\n\n\n\n<p>Conducte refulare &#8211; 7.357 km; Conducte refulare &#8211; 3.029 km;<\/p>\n\n\n\n<p>Sta\u021bii de pompare ape uzate (SPAU-uri) &#8211; 26 buc\u0103\u021bi. Sta\u021bii de pompare ape uzate &#8211; 9 buc\u0103\u021bi<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<div style=\"width:100%; text-align:center;\"><img loading=\"lazy\" src=\"https:\/\/apavil.ro\/wp-content\/uploads\/2025\/03\/cropped-apavil-logo.jpg\" alt=\"\" width=\"75\" height=\"75\"><\/div>\n<div style=\"width:100%; text-align:center;\">\n<p class=\"has-text-align-center\">Con\u021binutul acestui material nu reprezint\u0103 \u00een mod obligatoriu pozi\u021bia oficial\u0103 a Uniunii Europene sau a Guvernului Rom\u00e2niei<\/p>\n\n<p class=\"has-text-align-center\"> Pentru informa\u021bii detaliate despre celelalte programe cofinan\u021bate de Uniunea European\u0103, <br>v\u0103 invit\u0103m s\u0103 vizita\u021bi: <a href=\"https:\/\/mfe.gov.ro\/\">https:\/\/mfe.gov.ro\/<\/a><\/p> \n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>PROIECT NEMAJOR PENTRU REALIZAREA RATEI DE CONECTARE DE 100% \u00ceN R\u00c2MNICU V\u00c2LCEA, OCNELE MARI, DR\u0102G\u0102\u0218ANI, C\u0102LIM\u0102NE\u0218TI, B\u0102BENI \u0218I B\u0102ILE OL\u0102NE\u0218TI Cod SMIS 2014+ 161869 &#8211; etapa I Cod SMIS 2021+ 318852 &#8211; etapa II Proiect cofinan\u021bat din Fondul de Coeziune<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/apavil.ro\/index.php?rest_route=\/wp\/v2\/posts\/7715"}],"collection":[{"href":"https:\/\/apavil.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/apavil.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/apavil.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/apavil.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7715"}],"version-history":[{"count":4,"href":"https:\/\/apavil.ro\/index.php?rest_route=\/wp\/v2\/posts\/7715\/revisions"}],"predecessor-version":[{"id":7719,"href":"https:\/\/apavil.ro\/index.php?rest_route=\/wp\/v2\/posts\/7715\/revisions\/7719"}],"wp:attachment":[{"href":"https:\/\/apavil.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/apavil.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7715"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/apavil.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}